Engagements.

Here's the shape of the work.

I take on one problem at a time — a structural read, a vendor-and-architecture decision, a compressed ship window, or a named seat at the table for a quarter. Every engagement ends the same way: the decision in writing, the path documented, the work imported into your tracker. Scope gets written in the first working session.

What every engagement produces.

  • The decision, in writing.

    One decision per load-bearing problem in scope — with the reasoning, the numbers, and the second-best path named.

  • The path, documented.

    Architecture where it's structural, vendor scorecards where the market is the problem, risks on the first page.

  • The work, imported.

    Sequenced tickets in Jira, Linear, or GitHub — acceptance criteria included, ready to pick up on day one.

  • Fixed scope, fixed fee.

    Scope is written in the first working session. Most engagements run six to eight weeks from access granted. Fractional Leader runs quarter-plus.

What that looks like, in practice.

  • Engagement

    Architecture Audit

    A structural read of the system you've built, the opportunity named, and the path to get there.

    • Root cause analysis where the architecture is costing money or velocity.
    • Remediation plan ranked by lift against revenue impact.
    • Importable tickets in your tracker at hand-off.

    Best fit: When the rebuild on the roadmap carries real weight and the team would move faster with a structured outside read.

  • Engagement

    Strategy & Architecture Design

    Vendor selection, internal architecture, and integration design decided and documented inside a single engagement.

    • Vendor scorecard and selection memo across the named market.
    • Architecture specification for the system you're about to build.
    • Integration design and downstream team handoff.

    Best fit: When three decisions are entangled and pulling them apart is more work than deciding them.

  • By inquiry

    Ship Sprint

    A scoped plan for a specific outcome you already know you need, with execution support on retainer after the plan lands.

    • Same four-phase sequence — read, decide, document, hand off — compressed around one named outcome.
    • Scope written in the first working session, then priced before work begins.
    • Execution support scoped at close, not pre-sold.

    Best fit: When you know exactly what needs shipped and you want a running start.

  • By inquiry

    Fractional Leader

    A named seat at the table for the quarter that needs one filled — bridge, transition, or specific bet.

    • Quarter-plus engagement, not a fixed-end scope.
    • Named availability per week and clear decision rights.
    • Best used when the role is temporary by design.

    Best fit: When you need the seat filled for a defined window, not a full-time hire.

How to pick a starting point.

  • The system is costing you and you don't know why yet → start with an Architecture Audit.
  • Greenfield build, three load-bearing decisions tangled together → Strategy & Architecture Design.
  • You know the outcome you need and want a scoped plan plus optional execution help → Ship Sprint.
  • You need the seat filled for a defined window, not a full-time hire → Fractional Leader.

If none of those describe the problem, describe yours. I'll name the shape or point you to someone who can.